Bonterra Resources, based in Val d’Or, Quebec, has released a new resource estimate for its three projects – Gladiator, Barry and Moroy – in the Urban Barry camp about 200 km northeast of Val d’Or.
For all the deposits, the indicated resource is 3.2 million tonnes averaging 6.33 g/t gold and containing 643,000 oz. of gold. The inferred resource is 6.2 million tonnes averaging 7.04 g/t and containing 1.4 million oz.
Highlights for each deposit:
- Gladiator: 743,000 indicated tonnes at 8.46 g/t gold for 202,000 contained oz. and 2.7 million inferred tonnes at 9.10 g/t for 897,000 oz.
- Barry: 2.1 million indicated tonnes at 5.84 g/t for 385,000 oz. and 2.7 inferred tonnes at 5.14 g/t for 453,000 oz.
- Moroy: 302,000 measured tonnes at 5.66 g/t for 55,000 oz., 3.2 million indicated tonnes at 4.77 g/t for 56,000 oz., and 396,000 inferred tonnes at 4.32 g/t for 55,000 oz.
The Gladiator and Barry deposits are located on the Urban-Barry property. The Moroy deposit is located on the property of the former Bachelor gold mine and includes the Urban-Barry mill where all ore would be processed.
The mill is undergoing an expansion to 2,400 t/d by the second half of the year. The existing rod and ball mills and the 12-metre thickener are being removed. In their places, a SAG mill, two new ball mills, a gravity circuit, a 23-metre thickener, and five leaching tanks are being installed.
(This article first appeared in the Canadian Mining Journal)
The post Bonterra releases resource estimates for Urban Barry camp appeared first on MINING.com.
Source: Mining.com