• Home
  • About Us
  • News
    • Events
  • Services
    • Geological Consultancy
    • Geological Event Planning
    • Souvenirs
  • Team
  • Magazines
  • Contact
The RockPost
No Result
View All Result
The RockPost
No Result
View All Result
Home Featured

Cupric Canyon secures financing for Khoemacau project in Botswana

Rockpost by Rockpost
August 25, 2019
in Featured
0
0
SHARES
26
VIEWS
Share on FacebookShare on Twitter

A $565 million funding package brings Cupric Canyon Capital one step closer to turning its Khoemacau project into a major copper and silver mine in northwestern Botswana.

The private company has been developing the project over the last six years, drilling 285,000 metres, completing permitting and land access agreements, securing required power and water, and acquiring a previously operated copper project and 3 million tonne per year processing plant adjacent to its flagship Zone 5 deposit.

The recent financing includes a $275 million senior debt facility from Red Kite Mine Finance along with a $265 million silver stream and $25 million subordinated debt facility from RGLD Gold AG, a subsidiary of Royal Gold (NASDAQ: RGLD).

The money will be spent on building the Khoemacau “starter project,” which involves underground mining of sulphide ores at Zone 5 at a rate of 3.6 million tonnes per year.

The project is expected to produce a copper concentrate with an average head grade of 40% and high-grade silver, resulting in annual production of 62,000 tonnes of copper and 1.9 million ounces of silver over a 21-year mine life.

The project is expected to produce a copper concentrate with an average head grade of 40% and high-grade silver, resulting in annual production of 62,000 tonnes of copper and 1.9 million ounces of silver over a 21-year mine life

Construction is forecast to take two years and Cupric Canyon expects to produce its first concentrate in the first half of 2021.

The company discovered Zone5 in 2012 and says it is one of numerous deposits on the 4,040 square kilometer land package. Zone 5 is described by the company as a sedimentary rock-hosted stratiform copper deposit.

Total development capex for the starter project is $397 million.

The mine plan involves three separate but adjacent underground mines developed at Zone 5, each producing 1.2 million tonnes a year on average during the first five years of production. Each of the mines will have its own independent ramp access and operate over a strike length of about 1,000 metres.

The mineralized material will be trucked 35 km to the Boseto processing facility it acquired in 2015.

The concentrate will be shipped to smelters in Africa and around the world.

Longer term, the company plans to expand the operation from 3.6 million tonnes per year to 5.8 million tonnes per year by building a standalone processing plant at Zone 5. The company plans to undertake a feasibility study on the expansion project, which would boost copper production up to 100,000 tonnes per year.

Khoemacau has JORC-compliant proven and probable reserves of 30.4 million tonnes grading 2.03% copper and 19.5 grams silver per tonne.

In addition to Zone five, the company has targets including Zone 5 North and the Zeta northeast deposits.

Khoemacau is in the central Kalahari copper belt, 65 km southwest of Maun, one of the largest towns in Botswana and the gateway to the Okavango Delta.

Cupric Canyon was set up in 2010 in partnership with funds advised by Global Natural Resource Investments (GNRI) and Cupric management to acquire and develop copper assets.

GNRI was formed by a management buyout of the former Barclays Natural Resource Investments private equity business from Barclays Bank Plc in October 2015.

(This article first appeared in The Northern Miner)

The post Cupric Canyon secures financing for Khoemacau project in Botswana appeared first on MINING.com.

Source: Mining.com

Tags: A Tag
Previous Post

Aztec identifies 11 porphyry targets at Cervantes

Next Post

Small fossils with big applications: BP Gulf of Mexico time scale

Next Post

Small fossils with big applications: BP Gulf of Mexico time scale

No Result
View All Result

Recent Posts

  • AN ELEGY FOR MALGWI KEFAS
  • ROSE NDONG: CALL TO DUTY AS NMGS PRESIDENT
  • KEBBI POISED TO BECOME LITHUIM PROCESSING HUB AS EL-TAHDAM SECURES $500 MILLION INVESTMENT
  • FOR SALE: GEMSTONE CUTTER/POLISHING MACHINE
  • TUNDE ARISEKOLA: PILLAR IN NIGERIA’S MINING, GEOSCIENCES COMMUNITY

Recent Comments

  • Professor So-ngor Clifford Teme,FNMGS, FNSME, FNAEGE. on COMEG: PERMANENT HEAD OFFICE, PUBLICITY OUR MAJOR HEADACHE – REGISTRAR/CEO
  • Engr. Adeleye A.Joshua on COMEG: PERMANENT HEAD OFFICE, PUBLICITY OUR MAJOR HEADACHE – REGISTRAR/CEO
  • Salome Waziri (PhD) on COMEG: PERMANENT HEAD OFFICE, PUBLICITY OUR MAJOR HEADACHE – REGISTRAR/CEO
  • Diving Zenobia on Reconstruction of underwater avalanche sheds light on geohazards that threaten underwater telecommunication cables

Archives

  • May 2025
  • April 2025
  • March 2025
  • January 2025
  • November 2024
  • October 2024
  • September 2024
  • August 2024
  • July 2024
  • April 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • May 2023
  • April 2023
  • December 2022
  • November 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • June 2022
  • October 2021
  • August 2021
  • May 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • October 2020
  • September 2020
  • August 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • July 2017
  • January 2016
  • September 2015
  • April 2015

Categories

  • Dating Tips
  • Featured
  • News
  • uncategorized
  • About
  • Advertise
  • Privacy & Policy
  • Contact

© 2025 RockPost All Rights Reserved.

No Result
View All Result

© 2025 RockPost All Rights Reserved.